How it works
Four steps. No fuss.
- 1
Send us the details
Drawings, site address, what is being lifted, weights and when. Photos help.
- 2
Site visit
We look at access, ground, overhead hazards and where the machine will set up. [CONFIRM WHEN A VISIT IS INCLUDED]
- 3
Plan delivered
A site-specific lift plan in plain language, with every supporting document referenced by page number.
- 4
Briefing
We walk the lifting team through the plan so everyone knows their job before the first lift.
Got a lift coming up?
Send the drawings and the details. We will tell you straight what is needed.
Get a lift plan